Time Impact Analysis Rosetta Stone for CPM
In this edition: Time Impact Analysis (TIA®) The Rosetta Stone for CPM Schedule Analysis Robert C. McCue, P.E., Consulting Engineer Mark D. Steele, P.E., Consulting Engineer Critical Path Method (CPM) schedules and formalized methods of analyzing schedule impacts...
Water Treatment: Not Just a Third World Issue
Donald R. Keer, P.E., Esq. MDCSystems® Consulting Engineer In March the United Nations celebrated World Water Day 2013 by choosing Water Cooperation (supplying clean, accessible water to vulnerable communities) as its theme. With continuous pressure being put on...
“No Damage for Delay” Clauses – An Update
“No damage for delay” clauses continue to divide the country and the courts on their application and interpretation. Although owners and prime contractors insist on enforceability, the net result typically shifts the risk onto the party least likely to negotiate fair limits, to control events on the jobsite and absorb the ultimate cost. Nevertheless, these clauses are found in most construction contracts in some form or another.
Getting Back On Track: Turning Around The Construction Project “Heading South”
Corporate owners and tenants who build in urban centers such as New York City are an “at risk” group. Getting everything “on line” quickly is expensive. Difficulties encountered during a failure in design or construction can be catastrophic if practical solutions are not developed promptly to get things back on track.
Risk Management in Design
In previous editions of the MDCAdvisor®, our contributors have addressed risk issues relative to budgeting and cost estimating as well as overall risk considerations. A key contributor to almost all of the potential project risk scenarios is the conception, development and execution of the design process for the project.
MDC Advisor® Survey Results
MDC Systems® wants to thank all of the MDC Advisor recipients who participated in the online survey regarding the effectiveness of our monthly electronic newsletter. This survey was conducted in June and July 2012 by Kramer Communications. MDC Systems® is pleased to...