Meet the Experts: Michelle Delehanty, PE, PMP
Ms. Delehanty is a newcomer to the MDC Systems® team, bringing with her over a decade of experience in construction management, engineering, and operations across a variety of industries, primarily healthcare and energy. Michelle has practical knowledge in the areas...
Comparative Solar System Performance Analysis
Preliminary Analysis of an Industrial Photovoltaic System and Comparison of Its Performance with a Wind Energy System and a Fuel Cell Power System The purpose of this article is to test the feasibility of installing a Photovoltaic (PV) System on an industrial facility...
No Damage For Delay
A no-damage-for-delay clause attempts to contractually bar recovery by a contractor or subcontractor in the event project delays result in damages or extra costs.
MDC Systems® Presents Advanced Engineering Project Management Course at Engineers’ Club of Philadelphia, Sept. 20, 2013
PM-2: Advanced Engineering Project Management: Avoiding Project Failure Friday, September 20, 2013, 7:45 am - 4:00 pm Engineers Club of Phildelphia This seminar is intended for engineers whose duties require the application of Project Management Principals to Program...
MDC Systems® quoted in Orlando Sentinel article on Orlando VA Medical Center
Bob McCue, PE, MDC Systems Consulting Engineer, is quoted by the Orlando Sentinel in its article on the VA Medical Center project delay (June 26, 2012) Click here for the full article.
What Standard? Under Whose Care?
Can a Designer or Owner shift responsibility for design errors and omissions by requiring an enhanced effort for construction coordination drawings by contractors?
To answer this question we will recount an example project that was bid as Design-Bid-Build where the fundamental element of the dispute was design defects with regard to spatial arrangement and sizing of system features.