Blog Fullwidth without Sidebar
Home > Blog Fullwidth without Sidebar
The Standard of Care in a Design Build World
Mar 1, 2022 | Articles, Professional Practice, Standard of Care
Design-Build Delivery can create new responsibilities for designers where they would not exist in traditional Design-Bid-Builddelivery situations and require new awareness on the part of contractors to the iterative and uncertain world of conceptual design. These new responsibilities require a paradigm shift for both Designers and Contractors as the realities of working together challenge the leadership of the organizations.
For designers the change requires them to abandon their traditionally “client only” focused advice and consent role and adopt a new paradigm of working for, or with, the contractor to deliver an acceptable and profitable product. For the contractor working with and supporting the designer changes the very nature of their previous working relationship. The contractor is now working with and for the people they are all too often at odds with concerning project delivery.
The Surety’s Completion Alternatives for Defaulted Contracts
Mar 1, 2022 | Articles, Owner Issues
When faced with a default on their projects, many owners have unrealistic expectations concerning the surety’s obligations under the performance bond. Owners feel frustrated when the surety does not aggressively step in to complete the work. However, under most performance bonds, if the contractor/principal is in default, the surety may discharge its obligations by any one of the following alternatives: (1) finance the contractor/principal to complete the work; (2) obtain a new contractor to complete the work under a direct contract with the owner/obligee; (3) complete the work with a new contractor under a contract with the surety; (4) permit or require the owner/obligee to obtain a new contractor; and…
Project Risk Reduction
Mar 1, 2022 | Articles, Project/Construction Management
Using Project Management Modeling Tools to Quantify, Analyze and Reduce Exposure to Risk
Some project histories are very complex and traditional schedule and damage analysis methods are not able to quantify the impacts of events that have occurred over the life of the project. In these situations MDC&Reg has relied upon more sophisticated mathematical and system based models to attribute impacts to particular events. The usual methods of determining and reducing risk on construction projects include schedule forecast, cost forecasts and change review analysis performed by the project team. However, sometimes these techniques do not allow for an overview that properly adds the effects of many individual events. On these occasions the project team needs more powerful and sophisticated tools that can include multiple project factors including resource availability, site conditions, environmental factors and productivity levels for both planned and actual conditions on the project to date, all factors that cannot be completely comprehended by the project manager without the aid of analysis.
Fukushima Dai-Ichi – Black Swan Event or Engineering Design Error?
Feb 28, 2022 | Articles, Technology
By Robert C. McCue, PE MDCSystems® Consulting Engineer Tsunami triggers destruction of nuclear...
