Blog Fullwidth without Sidebar
Home > Blog Fullwidth without Sidebar

Construction Manager at Risk Held to Assume the Risk of Design Changes on Massachusetts Public Construction Project
Oct 11, 2021 | Articles
Written by James D. Hollyday, Partner, Pepper Hamilton, LLC
Republished with permission. This article was originally published in the May 2015 issue of AGC Law in Brief.
“Construction management at risk” or “Construction management at risk services” or “Construction management at risk delivery method,” a construction method wherein a construction management at risk firm provides a range of preconstruction services and construction management services which may include cost estimation and consultation regarding the design of the building project, the preparation and coordination of bid packages, scheduling, cost control, and value engineering, acting as the general contractor during the construction, detailing the trade contractor scope of work, holding the trade contracts and other subcontracts, prequalifying and evaluating trade contractors and subcontractors, and providing management and construction services, all at a guaranteed maximum price, which shall represent the maximum amount to be paid by the public agency for the building project, including the cost of the work, the general conditions and the fee payable to the construction management at risk firm.

Is the Solution to our “Fracking Mess” Dilution or Concentration?
Oct 11, 2021 | Articles, Technology
(Waste Reduction and Pollution Minimization) The Problem The recovery of natural gas from tight...

Discovery – It’s Not All in the Documents
Oct 9, 2021 | Articles, Mediation
Document discovery is to be anticipated and disliked on every construction litigation effort. By their nature, construction projects are paper and electronic data generation machines. How can the litigation team quickly and efficiently navigate through the voluminous and redundant files while collecting the most important documents?

MDC Engineers Testify at Philadelphia City Council
Oct 5, 2021 | Articles
Julian Toneatto, Ph.D., PE and E. Mitchell Swann, P.E. testified on 1 August 2013 at a City of Philadelphia City Cophilabldgcollapseuncil hearing looking into techniques, technologies and guidelines to improve building demolition practices within the city. [Background: On 5 June 2013, a building under demolition experienced an uncontrolled collapse which fell onto an adjacent retail property which was occupied at the time. There were 6 fatalities and 14 injuries, several of them critical.