Hurricane Sandy – Another Storm, Same Recovery Challenges
Nov 23, 2021 | Articles, Technology
In my personal experience, gasoline lines (fuel shortages) and communications problems have been predictable after effects of major storms for fifty years. My first storm recovery effort was Hurricane Agnes in 1972. At the time I was a student at Penn State University (recently released from four years of active duty) and a Captain in the Pennsylvania National Guard based out of Lewistown, PA. During the storm we performed rescue and evacuation work in and around Lewistown and then food distribution and fuel delivery to local municipalities on the I – 80 corridor from Altoona to Scranton. Many roads were destroyed in Central Pennsylvania and many bridges were missing resulting in isolation for many communities.
Standard of Care Engineering: What You Should Know
Nov 22, 2021 | Articles, Design Management
There are few issues in construction disputes that are more complex than standard of care claims. Architects, engineers, and construction administrators alike have a professional and ethical responsibility to protect public safety. A licensed architect works with a structural engineer, who develops specifications for a project on paper, and those plans should be of sound design and illustrative of a professional level of expertise.
Complexity: A Transient Condition Precedent to Project Failure
Nov 22, 2021 | Articles, Project/Construction Management, Systems Thinking & Complexity Theory
Robert C. McCue, P.E.
MDC Systems®
Consulting Engineer
MDCSystems® has been providing Forensic Project Management (FPM®) services for over forty years for industrial, transportation and institutional capital projects. Using this extensive knowledge base, MDC®, develops and conducts seminars for the public and private sectors on many topics including the topic of Complexity and Systems Thinking.
Contractor’s Conduct Negates Pay-If-Paid Clause
Nov 20, 2021 | Articles, Owner Issues
Under “pay-if-paid” clauses a subcontractor is not entitled to payment if the owner fails to pay the general contractor, regardless of whether the subcontractor was at fault. General contractors use these clauses to assign to their subcontractors the risk of owner nonpayment.