Design–Build In Name Only
By Robert C. McCue, PE, MDCSystems®
- Is this application well suited for the contract type?
- Does the design aspect depend on unique or specific components/systems which limit the flexibility/buildability of the project thereby removing a key attribute of the Design – Build incentives?
- Are the profit incentives well designed for the types of issues expected to arise on the project?
- Is there a formula/understanding for the allocation of losses?
- How are project constraints determined and allocated as to responsibility; tenant issues, occupancy, environmental restraints etc.
- How was the overall schedule developed considering the design progress to date, anticipated completion details and owner involvement in design decisions, value engineering and options.
- How was the balance between responsibility and authority over changes to the project developed and how will it be administered during the life of the project?
MDCSystems® has been involved in a number of Design-Build project review and evaluation situations and has found that many of these issues are not fully considered prior to undertaking the work. In some instances this leads to a series of problems resulting in additional costs and lost time.