Providing Expert Solutions For Projects Worldwide

Providing Expert Solutions For Projects Worldwide

Phone: (610) 640-9600

Fax: (484) 301-0969

Archive: Spring 1996, MDCAdvisor® Expert Newsletter

  • Featured Story: “Shipyards Dealing with Disruption Claims” an expert article by Rod Findlay, Project Mgr ofMDC Systems®.
  • Contract Primer: “Shipyard Contracts-New Construction vs. Ship Repair” by by Rod Findlay, Project Mgr ofMDC Systems®.
  • Casenote: Ship Repair Contracts-Proof of Delay and Disruption by Barry B. Bramble, Vice President ofMDC Systems®.

[pdf-embedder url=”https://mdcsystems.com/wp-content/uploads/2015/07/MDCAdvisorSpring-1996.pdf”]

Related Posts

MDC Advisor® Issue 80 – Choosing The Right Expert

MDC Advisor® Issue 80 – Choosing The Right Expert

In this edition: Choosing the Right Expert: Lessons in Delay Analysis and Credibility from Dependable Mechanical Systems v. Ledcor Professional Spotlight: Stephen M. Rymal Design Risk-How to Design a Brave New World Case Highlight: U.S. Federal Office Building and...

read more

0 Comments