Scheduling Project

Client Name: Black & Veatch

MDC® was retained by our client to determine if the utility had contributed in any material way to the problems associated with either the removal or installation of the new generators. MDC® developed a detailed analysis of the problems encountered during the execution of the removal and installation work. MDC® determined that much of the delay in the installation of the generators was due to delay by a subcontractor responsible to Raytheon. MDC® also determined that additional delays were the result of inadequate verification by the contractor. Thus, the majority of the underlying conditions that caused the excess costs were not due to problems created by our client.

Pakistani Gas Turbine Power Plant

Client Name: NEPCO

MDC® was requested to provide expert analysis to an EPC contractor in a multi-party insurance litigation concerning a project in Pakistan. MDC® performed an expedited review of both technical and scheduling issues and worked with outside counsel in the UK to identify and analyze project delays and identify their relationship to technical and contractual issues, including force majeure events, physical damage to equipment and delay causation.

Oman Combined Cycle Power Plant

Client Name: Stone & Webster Engineering, Inc.

MDC® was asked to investigate and analyze a contract with Petroleum Development Oman (PDO) for the detailed engineering and construction of a gas-fired turbine electric generating plant located in Oman at Saih Rawl. The power plant was to supply electrical power to the national grid and to the adjacent gas processing plant. A waste heat recovery unit in the power plant was to provide process heat to an adjacent gas plant being constructed by others.

Combined Cycle Power Plant

Client Name: NEPCO

MDC® provided expert analysis and support to a design-build contractor in a dispute with a major equipment vendor. The dispute centered around the vendor’s late delivery of improperly fabricated Heat Recovery Steam Generator (HRSG) components. MDC® evaluated the impacts arising from the vendor’s performance including delays to the project schedule, productivity loss to the installation subcontractor, and monetary damages to the design-build contractor.