San Felipe Springs Water Treatment Plant, TX

The City of Del Rio, Texas had been concerned with the continuing operation of the San Felipe Springs Water Treatment Plant that was constructed in 2000. The facility had experienced piping failures on a number of occasions in the PVC piping associated with the filtration system. In addition, excessive pipe movement and the build-up of sedimentation in the piping was also a concern to the City.

Multipurpose Pharmaceutical Plant

Client Name: Schering Plough Pharmaceutical Company

MDC® was retained by Schering Plough, a major pharmaceutical manufacturer, to evaluate the performance of the Architect/Engineer during design and construction of a multipurpose bulk pharmaceutical plant. MDC® identified errors and omissions of the Architect/Engineer and analyzed the effect of delayed and incomplete design on construction costs and completion of the plant for a major international arbitration. Technical issues involved design and fabrication of major ductwork and piping systems.